Anbar Journal of Engineering Science
Login
Anbar Journal of Engineering Sciences
  • Home
  • Articles & Issues
    • Latest Issue
    • All Issues
  • Authors
    • Submit Manuscript
    • Guide for Authors
    • Authorship
    • Article Processing Charges (APC)
  • Reviewers
    • Guide for Reviewers
    • Become a Reviewer
    • Reviewers of AJES
  • About
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Journal Insights
    • Peer Review Process
    • Publication Ethics
    • Plagiarism
    • Allegations of Misconduct
    • Appeals and Complaints
    • Corrections and Withdrawals
    • Open Access
    • Archiving Policy
    • Journal Funding Sources
    • Announcements
    • Contact

Search Results for cash-flow

Article
Implications Of Cash Flow Forecasting On Highway Projects In Iraq

Bevian Ismail Al Hadithi

Pages: 56-62

PDF Full Text
Abstract

The cash flow forecasting is beneficial for the project in both the tender stage and during the project construction progress, where the contractors want to make sure that their planned cash funds is sufficient to cover any possible financial deficit of the project. This research aims to find out minimum fund needed for highway projects in Iraq required by the contractor to maintain the progress of work under some circumstances and effects of the shortage of fund, particularly in case of payment delay, in addition to the implication of the payment delay. Data from record files of 9 highway projects in Iraq, of the unit price type contracts. It was found that the minimum fund required is 20.944 percent of the contract value of three months delay . The minimum fund required for those projects is directly proportional to the time of payment delay. The minimum fund required for projects is represented in a linear equation as a function of payment delay time, such equation would help the contractor to estimate the future amount of minimum fund required for any delay in months. Interim profit is calculated for the purpose of comparison with the expected profit for the purpose of exploring the consequences in case exceedance. Because of the use of unit price contracts in the implementation of highway projects in Iraq, it did not cause the appearance that the contractor receives large profit at early stages of the project. The delay in payment leads to negative results, including the delay in the project, reduces the level of performance of the contractor which is negatively affects project, reduce the quality of implementation and, increased cost of the project in case of the contractor to claim compensation for the damage, as well as the occurrence of a difference in currency and inflation due to the time difference between the payment date and the actual date.

1 - 1 of 1 items

Search Parameters

Journal Logo
Anbar Journal of Engineering Sciences

University of Anbar

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie Settings
Licensing & Open Access

CC BY 4.0 Logo Licensed under CC-BY-4.0

This journal provides immediate open access to its content.

Editorial Manager Logo Elsevier Logo

Peer-review powered by Elsevier’s Editorial Manager®

       
Copyright © 2025 College of Engineering, University of Anbar. All rights reserved, including those for text and data mining, AI training, and similar technologies.