(1)
N. Sayle, K.; A. Al- Janabi, I. Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). AJES 2008, 1 (1), 143-159. https://doi.org/10.37649/aengs.2007.14260.